ANALISIS STRUKTUR LAPISAN BAWAH PERMUKAAN DENGAN METODE GEOLISTRIK DALAM PERENCANAAN PONDASI

Nugroho, Meriana Wahyu and Farida A, Fatma Ayu Nuning and Maya, Khodijah (2018) ANALISIS STRUKTUR LAPISAN BAWAH PERMUKAAN DENGAN METODE GEOLISTRIK DALAM PERENCANAAN PONDASI. Jurnal CIVILLa, 3 (2). pp. 186-191. ISSN 2503 - 2399

[img] Text
1.ANALISIS STRUKTUR LAPISAN BAWAH PERMUKAAN_fullcover.pdf

Download (1MB)
[img] Text
1.ANALISIS STRUKTUR LAPISAN BAWAH PERMUKAAN_perreview.pdf

Download (862kB)
[img] Text
1.ANALISIS_STRUKTUR_LAPISAN_BAWAH_PERMUKAAN_plagiasi.pdf

Download (1MB)

Abstract

The purpose of this study was to determine the structure of the subsurface at construction site Campus Rector Building B University Hasyim Ashari. Information subsurface structure used as the initial study foundation design. The research was carried out with resistivity geoelectric method using a resistivity meter. Interpretation of the track point J.01 - J.02 - J.03 known subsurface water dominated by basalt rocks, and discovered the hard ground at a depth of 12 m for planning the foundation beams, while on the track J.04 - J.02 - J.05 dominated by conglomerates and basalt rocks, and discovered the hard ground at a depth of 7 m to pile foundation design. Keywords: layer structure, geoelectric, resistivity, foundation

Item Type: Article
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Mr Rizal Sakhur
Date Deposited: 02 Jul 2022 11:14
Last Modified: 02 Jul 2022 11:14
URI: http://eprints.unhasy.ac.id/id/eprint/85

Actions (login required)

View Item View Item